Cosmetic vs. Full Kitchen Remodel @ Euro Pros Inc

Cosmetic vs. Full Kitchen Remodel

construction icon
  • calendar icon 11 Aug 2025

Remodeling a kitchen in Naperville, Chicago, or Aurora increases home value, but choosing between a cosmetic or full remodel depends on budget and goals. Euro Pros Inc., with over three years of experience in the construction industry, has completed remodeling projects in Naperville, Chicago, and other cities and offers the following step-by-step plan.

Step 1: Define Goals and Budget

Decide whether a cosmetic remodel (painting, backsplash replacement) or a full remodel (renovation, new plumbing) is needed. Tip: Create a budget with a 10ontingency

Step 2: Assess Condition

Inspect plumbing, wiring, and ventilation. In Chicago, we found outdated wiring requiring replacement before a full remodel. Tip: Use NEC standards to inspect the electrical system and determine if additional GFCI outlets are needed

Step 3: Choose Materials

For a cosmetic remodel, select Sherwin-Williams Mold-Resistant paint, tile, VersaBond tile adhesive, and Polyblend Plus grout. For a full remodel, choose countertops and cabinets meeting ASTM D3359 standards. Tip: Test materials for durability and moisture resistance.

Step 4: Plan the Work

Cosmetic remodels take 3–7 days, full remodels 2–4 weeks. In Chicago, a full kitchen remodel with new plumbing took 3 weeks. Tip: Protect floors with film and coordinate timelines with contractors to avoid delays.

Step 5: Final Inspection

Visually inspect surfaces for defects and test plumbing for leaks through testing. Tip: Use an IICRC checklist for quality evaluation

Pro Tip for Success

Cosmetic remodels save money, while full remodels enhance functionality. Explore our portfolio in Naperville and Chicago. Euro Pros Inc. offers free consultations.

Euro
Pros